Thanks Bmac B)
So had a Frustrating and Fun Evening, The Template provided by Pontos 8 out of the 9 holes are Correct and took abit of research to figure out the proper placement for the last hole.
So After i fix that issue i prepared the Turret for Etch :laugh: You can see how Un Balance it is with the AM barrels
Took 3 Nuts to Balance Anton out
So next 3 hours took me to Finish about half the Etch and ni also fed the Carpet monster, There was a little Part on the Ladder that decided to go flying, Still looks good tho
The Template would of had the Railing in the Center Towards the left Off Center, You can see how it Centered in this Image
So had a Frustrating and Fun Evening, The Template provided by Pontos 8 out of the 9 holes are Correct and took abit of research to figure out the proper placement for the last hole.
So After i fix that issue i prepared the Turret for Etch :laugh: You can see how Un Balance it is with the AM barrels
Took 3 Nuts to Balance Anton out
So next 3 hours took me to Finish about half the Etch and ni also fed the Carpet monster, There was a little Part on the Ladder that decided to go flying, Still looks good tho
The Template would of had the Railing in the Center Towards the left Off Center, You can see how it Centered in this Image