Sherman 18
Master at Arms
The PE came in about six weeks early
Worked a little on the turret this last weekend. I filled the slots on the side of the upper turret with .010 x .030 styrene strip. Trying to keep myself in check on the detailing. I sanded most of the welds on the turret off as they were in the wrong place.
Still chasing the filling of the sink marks on the top of the turret.
Worked a little on the turret this last weekend. I filled the slots on the side of the upper turret with .010 x .030 styrene strip. Trying to keep myself in check on the detailing. I sanded most of the welds on the turret off as they were in the wrong place.
Still chasing the filling of the sink marks on the top of the turret.