• Modelers Alliance has updated the forum software on our website. We have migrated all post, content and user accounts but we could not migrate the passwords.
    This requires that you manually reset your password.
    Please click here, http://modelersalliance.org/forums/login to go to logon page and use the "Forgot your Password" option.

Pandemic Project No. 4.....SBD-3 Complete

MrT

Master at Arms
Staff member
DSC09596.JPG
DSC09599.JPG
DSC09600.JPG
DSC09601.JPG
 
Hmmmm, Terry drilled out all those dive brake perforations.... The Hasegawa kit I have tells you to cut off the dive flaps and replace them with a whole raft of PE. Drilling out the holes looks like a better idea.
 
Hmmmm, Terry drilled out all those dive brake perforations.... The Hasegawa kit I have tells you to cut off the dive flaps and replace them with a whole raft of PE. Drilling out the holes looks like a better idea.

Yep drilled them all out. :bang head. I was going to drop the bottom flaps, but when things started to break decided not to.
 
Back
Top