• Modelers Alliance has updated the forum software on our website. We have migrated all post, content and user accounts but we could not migrate the passwords.
    This requires that you manually reset your password.
    Please click here, http://modelersalliance.org/forums/login to go to logon page and use the "Forgot your Password" option.

Dora 1/35

Mike,Christian,MrT,James,Bob,ausf,Luiz and heavens Eagle thanks a lot. working hard on it to see it finished asap
 
What a thrilling update! I'm glad to see this; I always wondered what was in that cabin below the loading deck. Your details really make this pop! Well done!
 
Thanks Duke, they did this area so that you can asssemble the doors opened or closed but the interior is completely empty, so I decided to make the interior with just one photo of the engine from a distance, so it's my interpretation of how it may have been.
 
hdeade88.jpg
 
Hi to all again, here we are with a new update, soldering all the hand rails and ladders and other modifications took longer than expected but here it is. The engine compartment is finished and painted.

The engine is painted and covered to paint around it
Wz3Tvkc.jpg


hMQ1yjJ.jpg


mMs3Nhx.jpg


W2sBCiK.jpg


voK57yD.jpg


uiETAkQ.jpg


The control panel is done using styrene bits and various decals for the gauges, the opening is measured and the various hole sizes done with a punch
ixx9AAe.jpg


uLo5mLy.jpg


Two strips are glued to the sides to make deep for the hand wheel
DGNOkda.jpg


The control panel installed
Xhucmas.jpg


Now the rear coupler is modified so the pipes that run on the sides can pass through it

The plastic is cut on both sides of the rear of the coupling
kJ6wpdW.jpg


The hole is smoothed and sanded to shape
VjUe0NT.jpg


797iZc8.jpg


With the correct shape done a strip of styrene is added as a flange
re9md8M.jpg


LO0skIT.jpg


Both sides are done
v72f4rY.jpg

It looks like this installed, the pipes now pass through it
ko5f3qq.jpg


WVKE8hc.jpg


The side platforms are now modified, the detail under it is corrected and the hand rails made

Top and bottom of the platforms
XNZWG4q.jpg


All the details from the bottom are sanded off
XhEvIvg.jpg


The new parts are cut to the correct size from styrene sheet
33Ni6ah.jpg


Fz0AnKL.jpg


EqAIcEE.jpg


Both sides are done, now the hand rails are added
WyFqwVB.jpg


This are now finished
hi4rl45.jpg


This is where the side platforms goes, the strange shaped bars are supposed to be large wrenches
Not sure what this are used for maybe assembly tools. So I removed the plastic where the end of the wrench goes
YuX6Zpg.jpg


XLcEgJu.jpg


71WgEkD.jpg


Now I used a panzer IV wrench from the tool set to make the heads for the new wrenches
The form is traced to styrene sheet
8ON8elI.jpg


Now it looks like this
nCchSNw.jpg


Now the looking pieces are made with styrene disk and a piece of rod
ZomZhUU.jpg


cMl3xAx.jpg


Finished, this is done on the other side also
1CJ0VVf.jpg


Both sides’ ladders are made again from 1.5 brass rod, note the difference between the original and new one
VTRjxGP.jpg

PBwsmdy.jpg


The access to the top is also made bigger as the original is too small
kM66zYo.jpg


Now it is bigger, the doors are also made bigger to match the new size of the access

OAAkSxb.jpg


I made the doors with a part of the original catwalk from the generator
pVJRU6A.jpg


The plastic is cut to size and sanded down to the correct thickness
f0JyPT7.jpg


The doors for both sides are done, it also received details from styrene and wire handles
mJL8pGt.jpg


tPcpSbv.jpg


The finished platform now looks like this

6obmJBO.jpg


The elevators received new handrails from 1.5 brass made to the correct shape
ci0SQJi.jpg


Note that the shape is different on the elevators handrails
23MYtFI.jpg


There is a support that goes in the middle of the loading platform body, it is missing on the kit
So after measuring and making the diagram I started to construct it
From styrene sheet and strips for flanges
HPcBWaO.jpg


The measurements are drawn on the styrene
0yYjy0f.jpg


The holes are cut open
nPNiWCS.jpg


The finished part with all the flange and reinforcements
CBiBuvO.jpg


The part is glued in place, big piece to be missing from the kit, right?
c8dkuUQ.jpg


Have lots more of work done but this update is already too long so more soon and thanks for watching
Abdin
 
:woohoo: Some mighty fine work my friend ... I had to spend a hour or two looking up from p 14 were I last posted. I've been out of it latey with different troubles hitting me. Awesome work ... Keep it up & I'll try to keep a eye peeled ... (y)
 
Simply fantastic Abdin,

What can anybody say about this build! It's really gonna be something when you're finished!

I have one of these myself and, if I ever get around to building it, your efforts will save me a lot of time!

Great job!!!

(y) (y) (y) (y) (y) (y) (y)

Bob
 
Your updates can never be too long! Magnificent work you are doing; the improvements you've made are really making this thing shine!

Bring on more!
 
:notworthy X 20 as above.......Wow. Fantastic scratch work and attention to detail. I hope this will still be available to view when I get around to building Mine!
Thanks for all the reference work Abdin! :v

Ian.
 
HI friends, time for another update, more modifications are made in different areas of Dora,
Continuing with the ladders, the front and interior ladders are done, again using 1.5mm brass rod

This are the side balcony ladders measurements that I forgot to include in that post, so here it is
VMzeV2s.jpg


Here are the new interior ladders with measurements and the original for comparison, two are needed
1PuusjG.jpg


Now the front access ladders
The first bend is done in the corrected angle
YApaA8m.jpg


Note the difference with the original
M4LjSNU.jpg


The second bend is done
f6lgsro.jpg


Next the steps are soldered to one side first and then the other side is soldered
wbemahE.jpg


Comparison with the original and the new measurements
nRYMVtt.jpg


MQGJnAR.jpg


Now the loading platform hand rails are modified again on the area around the elevators, after researching photos I noticed some differences and noted some hand rails are completely missing also on this area

The end of the hand rail is removed and the new short section added on each side
hQMOETR.jpg


AT1x6B8.jpg


Here you can notice that the end of the rail base is longer, the last connecting point is in the air, so using a piece from the generator catwalk I added a strip to make the floor the same length so the corner rail pieces can be installed
jpzGkJx.jpg


uRJbIYN.jpg


CG4Xt22.jpg


Next the parts that complete the corner are soldered to the new short rail
DyLGjkD.jpg


s6LSrEd.jpg


Now more sections of rail are added around the elevators area, not made on the kit parts
3yJMdOc.jpg


Here the new rails can be seen in place
JBHHwt9.jpg


NmASnil.jpg



I now started to work on the loading ram and its base, it is modified and detailed
After studying the ram parts and loading table I concluded that the measurement on the kits ram tubes is the wrong number of sections and too short to load the shell completely into the breach, here I dry fitted the parts.
As you can see the ram is too short to completely load the shell
gfuNdOV.jpg


It is supposed to pass through the breech and into the barrel
IdwY4Lo.jpg


This are the original ram parts
ao5UxrA.jpg


I replaced the parts with styrene tube and added an additional section to it, here are the originals and the new parts with measurements, the thinner tube is longer here, it was cut to the correct length later
Zoom3eC.jpg



The pushing disk is now glued to the new tube
06frWrq.jpg


C5JYrYm.jpg



ORJ1bBi.jpg


Now it works as it is supposed to, passing through the breech
lVanZkW.jpg


CfBrjSx.jpg


lGglwjZ.jpg


Works continues on this area with more detail added to the ram base and modifications to the loading bead
Missing access doors are made from styrene and brass wire for handles, styrene rod bits are used for bolt detail
q7niJyD.jpg


Tabr7Zo.jpg


The ribs on the ram base receive a flange made from 2.9 x .35mm strip
lrH0ujz.jpg


The disk that is stored on the front of the base need to be moved inwards a little so that two front plates can be installed
LArqsOk.jpg


The grove for the disk is enlarged to allow it to move inwards
tkQfEna.jpg


Also a channel was cut into the wheels support to allow the disk to be moved into the new position
szeMtiF.jpg


7JQZVI7.jpg


This are the shape and measurements of the front plates
Smc59eV.jpg




Using styrene sheet I made the two plates
hehND1U.jpg


hhgK8yg.jpg


It looks like this now
ZIM3E4A.jpg


FBsM6ye.jpg


Still more work to do on the ram base so stay tuned and thanks for watching

Abdin
 
Back
Top