• Modelers Alliance has updated the forum software on our website. We have migrated all post, content and user accounts but we could not migrate the passwords.
    This requires that you manually reset your password.
    Please click here, http://modelersalliance.org/forums/login to go to logon page and use the "Forgot your Password" option.

Search results

  1. Tim A.

    1/16 scale Tiger 1 early.

    Thanks Ian!
  2. Tim A.

    1/16th scale sFH 18 Howitzer

    I know your stress on these big builds. It seems like every part is in your face. I fretted over the proper stance of the suspension on the Tiger build for several days.
  3. Tim A.

    1/16 scale Tiger 1 early.

    A little more work. Got the tools and track cable put together. I also had to modify the kit's hold down clamp bar for the feifel tubes. I wondered if they would've left them on after removing the filters. In the pic of a stuck Tiger that has a good view of the rear deck they clearly left...
  4. Tim A.

    1/16 scale Tiger 1 early.

    The pic of it on the model is my fix.
  5. Tim A.

    1/16 scale Tiger 1 early.

    Takom & Das Werk both mold the jack block wood in the same way wrong. It's a pretty easy fix, though.
  6. Tim A.

    1/16 scale Tiger 1 early.

    Thanks Paul. I winged the fasteners on the V duct. Really can't tell what they actually looked like and I don't wanna know either...haha.
  7. Tim A.

    1/16 scale Tiger 1 early.

    Thanks Mike!
  8. Tim A.

    Artemis II Mission live feed

    When the launch was halted at T minus 10 minutes I guess it was wrong of me to say to my wife that the lady just told the rest of the crew she had to pee.
  9. Tim A.

    Artemis II Mission live feed

    Forgot the plunger 🥴
  10. Tim A.

    1/16 scale Tiger 1 early.

    The exhaust pipe's flappers in this kit are molded closed. During some research I found out they were locked open with a pin during normal operation. I performed surgery on the kit's. Next was the Feifel "V" shaped breather duct. On the tank #02 I'm doing the filters have been removed, based on...
  11. Tim A.

    1/16 scale Tiger 1 early.

    It's gonna make a sneaky coin bank
  12. Tim A.

    1/16 scale Tiger 1 early.

    It's gonna make a sneaky good coin bank.
  13. Tim A.

    1/16 scale Tiger 1 early.

    I blacked out the inside of the hull and the grating from the underside with some Tamiya nato black before gluing on the top of the hull. It proved to be a struggle to get it on without gaps. Not surprising, though as it's a large piece of plastic. Had to use thinned down putty in a few areas...
  14. Tim A.

    1/16 scale Tiger 1 early.

    Finally got the tracks built. Next step was to not follow the steps, per the instructions. Test fitting the parts that make up the hull I could see there would need to be some tweaking, so I wanted to get them together straight before adding all of the details as the instructions show to do...
  15. Tim A.

    1/16 scale Tiger 1 early.

    Very cool Ian 🫡👍👌Thanks so much for taking the time to put this info together!
  16. Tim A.

    1/16 scale Tiger 1 early.

    I have tracks for one side made and my fingertips are sore. Theres over 300 individual parts for the set, but I new what I was getting into when I bought the ticket.
  17. Tim A.

    1/16 scale Tiger 1 early.

    Thanks Saul! I can see which mantlet and it's the one I was going to go with. Alma & Ursula must have been some biggin fun time girls.
  18. Tim A.

    1/16 scale Tiger 1 early.

    Read on a few sites that tank crews did not wear hobnail boots....there is an exception for just about everything.
  19. Tim A.

    1/16 scale Tiger 1 early.

    Thanks Ian! And good night.
Back
Top